Step 4of the BuildUp System

Permit Process

Track every permit requirement. Check off items as you go. Ask the AI helper if you get stuck.

Permit Progress

0 of 23 complete
0 Approved0 In Progress0 Issues23 Not Started
Verify lot is zoned for intended use (R1, R2, etc.)
Check overlay districts (historic, environmental, HOA)
Confirm setback requirements with jurisdiction
Check lot coverage and FAR (floor area ratio) limits
Verify utility connections available (water, sewer, power, gas)
Check for easements or right-of-way restrictions
Pre-application meeting with planning department
Survey / topographic survey completed
Geotech / soil report (if required)
Stormwater drainage plan / SWPPP
Site plan showing setbacks, footprint, driveways
Architectural plans (stamped by architect/engineer)
Structural engineering plans
Energy code compliance (Title 24 / IECC)
Mechanical / Plumbing / Electrical plans
Submit building permit application
Pay permit fees
Address plan review comments / corrections

Permit AI Helper

Ask questions about permitting, zoning codes, setbacks, or any step in the process.

Common Questions